SteelCAD Technology
  • Home
  • Services
    • Our Process
  • Projects
    • Commercial
    • Industrial
    • Airports and Train Stations
    • Highrise
    • Stadiums
  • Contact
    • About
    • Contact Us
Commercial Projects
MARINA BAY SANDS Hotel Roof (Skypark)
Civic Cultural & Commercial Building
Asia Tower 2 Steel Roof
Marina Bay Sands Integrated Resort - Lion Garden Bridge
Sentosa Boardwalk
Carlton Hotel Roof Crown
Hotel Phoenix Roof
Ocean Financial Centre Roof
BMW Showroom
Clementi Cityvibe 
Formula One Pit Building
North Coast IMFS Phase 2
Duxton Plain Link Bridge
Kimlim Condominium
Dubai Carpark Roof
Singapore

Singapore

Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore
Singapore

Singapore
Signapore
Dubai
8,800 Tons

12,000 Tons

1,500 Tons
1,200 Tons
300 Tons
180 Tons
560 Tons
330 Tons
360 Tons
500 Tons
600 Tons
1,100 Tons
1,200 Tons
420 Tons
520 Tons
15,000 Tons
Featured Projects
Picture
MARINA BAY SANDS
Hotel Roof (Skypark)
Singapore

8,800 TONS


Design by renowned Architect Moshe Safdie, the SKYPARK was sit on top of 55th storey
three hotel towers. The superstructure was built at the height of 220m using more than
8,800 tons of steel and it has an area of 1.2 hectares at the length of 340m long including a 67m long cantilever.
STPL instrumental in preparation of 3D model and detailing of main steelworks, assist in
preparation of method of erection for observation deck support. Shop/fabrication
drawings was completed within fourteen months of detailing duration
.

Picture
CIVIC CULTURAL & COMMERCIAL BUILDING
Singapore

12,000 TONS




The 12,000 tons CCRC project was built in Bouna Vista, Singapore. It is constructed at the height of 72.2m by the owner ROCK PRODUCTION PTE. LTD./CAPITALAND RETAIL LIMITED and design by AEDAS PTE. LTD.
In addition to shop detailing on this project STEELCAD TECHOLOGY PTE.LTD. assist the consultant PARSONS BRINKERHOFF in providing 3D output for various complex elements for Design & Engineering.
The steelwork of this project was fabricated & erected by YONGNAM ENG’G & CONSTRUCTION PTE. LTD. STPL completed over 6,000 shop/fabrication drawings with in Twenty months of detailing duration.



Picture
Dubai Carpark Roof
Dubai

Powered by Create your own unique website with customizable templates.